Monday 28 November 2011

Here is the Mantis at the end of the day with most of the power pack back together. I still need to finish the tank, but currently I'm waiting for a few parts from Stauff.


Tomorrow I need to size up the cooler return pipe, the cooler suction pipe and the case drain pipe. These are the last of the hydraulic cables that I need to re-place with the new layout. I also need to chase up Stauff, which are taking forever to get back to me with price and availability info on some of their products. I have the aluminium stand-off's for the tank and the seat being made by D&T, they should be with me some time this week. Also need to look at gluing the heat sinks to the back of the tank.