Monday 28 November 2011

Bulk head Re-Assembly

I collected the bulk head frames from the powder coaters this morning and re-assembled the bulk head, tank and seat support.
 
Here is the relocated isolator switch and throttle control which can be reached by the right hand while seated. The throttle was previously located on the cab frame, but I think it is better off here so the cab can be removed if required. I'm going to look for a new home for the manometer also. 

Here you can see the rest of the electrical system reinstated. I have a few bit to finish with the electrics and then test it but its pretty much there.
A front view of the new tank without the seat

.